Lithium Battery Cb Test Report Lead Time – IECEE- CB – MCM

Short Description:


Project Instruction

Products tags

Related Video

Feedback (2)

Rich Experience: MCM has helped clients in worldwide by completing more than 50,000 UN38.3 test reports and certificates. Kc 62133 Quotation , Ce Technical Requirement , Ctuvus Testing Service , MCM is equipped with standard PSE test requirements, such as mandatory internal short-circuiting, to provide customers with JET, TUV RH, MCM and other customized test reports.
Lithium Battery Cb Test Report Lead Time – IECEE- CB – MCM Detail:

▍What is CB Certification?

IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates.

CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the tested product samples conform to present standard requirement.

As a kind of standardized report, CB report lists relevant requirements from IEC standard item by item. CB report not only provides results of all required testing, measurement, verification, inspection and assessment with clearness and non-ambiguity, but also including photos, circuit diagram, pictures and product description. According to the rule of CB scheme, CB report will not take effect until it presents with CB certificate together.

▍Why we need CB Certification?

  1. Directly recognized or approved by member countries

With CB certificate and CB test report, your products can be exported to some countries directly.

  1. Convert to other countries certificates

The CB certificate can be directly converted to the certificate of its member countries, by providing the CB certificate, test report and difference test report (when applicable) without repeating the test, which can shorten the lead time of certification.

  1. Ensure the Safety of Product

The CB certification test considers the product’s reasonable use and foreseeable safety when misused. The certified product proves the satisfactory of the safety requirements.

▍Why MCM? 

● Qualification: MCM is the first authorized CBTL of IEC 62133 standard qualification by TUV RH in mainland China.

● Certification and testing capability: MCM is among the first patch of testing and certification third party for IEC62133 standard, and has finished more than 7000 battery IEC62133 testing and CB reports for global clients.

● Technical support: MCM possesses more than 15 technical engineers specialized in testing as per IEC 62133 standard. MCM provides clients with comprehensive, accurate, closed-loop type of technical support and leading-edge information services.


Product detail pictures:

Lithium Battery Cb Test Report Lead Time –  IECEE- CB – MCM detail pictures


Related Product Guide:

Guangzhou MCM Certification & Testing Co., Ltd. is a world-leading independent third-party organization, who is specialized in providing the cutting-edge information and professional solution of battery testing and certification at a global scope. Lithium Battery Cb Test Report Lead Time – IECEE- CB – MCM , The product will supply to all over the world, such as: Cologne, Cyprus, Macedonia, As CBTL, MCM can provide clients with ‘one set of samples, one testing, two certificates’ solution, giving clients the best solution with lowest cost of time and money.
  • It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.
    5 Stars By Mag from Jordan - 2017.10.23 10:29
    This company conforms to the market requirement and joins in the market competition by its high quality product, this is an enterprise that have Chinese spirit.
    5 Stars By Hilary from Nepal - 2018.12.14 15:26
    Write your message here and send it to us