Indian Authority released a new batch of CRS list of electrical equipment,
anatel homologation,
PSE (Product Safety of Electrical Appliance & Material) is a mandatory certification system in Japan. It is also called ‘Compliance Inspection’ which it is a mandatory market access system for electrical appliance. PSE certification is composed of two parts: EMC and product safety and it is also an important regulation of Japan safety law for electrical appliance.
Interpretation for METI Ordinance for Technical Requirements(H25.07.01), Appendix 9,Lithium ion secondary batteries
● Qualified facilities: MCM is equipped with qualified facilities which can be up to the whole PSE testing standards and conduct tests including forced internal short circuit etc. It enables us to provide different customized testing reports in the format of JET, TUVRH, and MCM etc.
● Technical support: MCM has a professional team of 11 technical engineers specialized in PSE testing standards and regulations, and is able to offer the latest PSE regulations and news to clients in a precise, comprehensive and prompt way.
● Diversified service: MCM can issue reports in English or Japanese to meet clients’ need. So far, MCM has completed over 5000 PSE projects for clients in total.
On November 11, 2020, Indian Ministry of Heavy Industries and Public Enterprises released a new Quality
Control Order (QCO), namely Electrical Equipment (Quality Control) Order, 2020. Through this order, the
electrical equipment listed below should comply with the corresponding Indian standards. The specific products and corresponding standards are shown below. The mandatory date is proposed to be on November 11, 2021.
Following the release of the fifth batch of CRS list last month, India has updated a batch of electrical
product lists this month. Such a close update speed shows that the Indian government is accelerating the pace of compulsory certification of more electrical and electronic products. Most of the products announced so far can be tested and applied for certification. The certification lead time is about 1-3 months. Customers are advised to plan ahead according to their own needs. For details, please contact MCM customer service or sales team.