Featured

Browse by: All
  • Lithium Battery Anatel Act.3484 Testing Time Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Anatel Act.3484 Testing Time Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Battery Eac Testing Laboratory Lead Time –  Customs Union- EAC, GOST-R – MCM

    Battery Eac Testing Laboratory Lead Time – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Un38.3 Price Certificate –  –  Transport- UN38.3 – MCM

    Un38.3 Price Certificate – – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • Battery Gost R Technical Documents Lead Time –  Customs Union- EAC, GOST-R – MCM

    Battery Gost R Technical Documents Lead Time – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Lithium Battery Malaysia Sirim Technical Requirement Service –  Malaysia- SIRIM – MCM

    Lithium Battery Malaysia Sirim Technical Requirement Service – Malaysia- SIRIM – MCM

    ▍SIRIM Certification For the security of person and property, Malaysia government establishes product certification scheme and puts surveillance on electronic appliances, information & multimedia and construction materials. Controlled products can be exported to Malaysia only after obtaining product certification certificate and labeling.  ▍SIRIM QAS SIRIM QAS, a wholly-owned subsidiary of the Malaysian Institute of Industry Standards, is the only designated certification unit o...
  • Lithium Battery Brazil Anatel Testing Time Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Brazil Anatel Testing Time Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Battery Cb Certification Lead Time –  IECEE- CB – MCM

    Battery Cb Certification Lead Time – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Battery Kc 62133 Certification Lead Time –  Korea- KC – MCM

    Battery Kc 62133 Certification Lead Time – Korea- KC – MCM

    ▍What is KC? Since 25th Aug., 2008,Korea Ministry of Knowledge Economy (MKE) announced that the National Standard Committee will conduct a new national unified certification mark — named KC mark replacing Korean Certification during the time between Jul. 2009 and Dec. 2010. Electrical Appliances safety certification scheme (KC Certification) is a mandatory and self-regulatory safety confirmation scheme according to Electrical Appliances Safety Control Act, a scheme which certified...
  • Battery Iecee Lead Time Service –  IECEE- CB – MCM

    Battery Iecee Lead Time Service – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Battery Battery Eac Requirement Report –  Customs Union- EAC, GOST-R – MCM

    Battery Battery Eac Requirement Report – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Lithium Battery Brazil Anatel Certification Service Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Brazil Anatel Certification Service Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • China Battery Cqc Tr –  China- CQC – MCM

    China Battery Cqc Tr – China- CQC – MCM

    ▍Certification Overview Standards and Certification Document Test standard: GB31241-2014: Lithium ion cells and batteries used in portable electronic equipment―Safety requirements Certification document: CQC11-464112-2015: Secondary Battery and Battery Pack Safety Certification Rules for Portable Electronic Devices   Background and Date of implementation 1. GB31241-2014 was published on December 5th, 2014; 2. GB31241-2014 was mandatorily implemented on August 1st, 2015. ; 3. On October 1...