Featured

Browse by: All
  • Fuel Cell Cqc Lead Time –  China- CQC – MCM

    Fuel Cell Cqc Lead Time – China- CQC – MCM

    ▍Certification Overview Standards and Certification Document Test standard: GB31241-2014: Lithium ion cells and batteries used in portable electronic equipment―Safety requirements Certification document: CQC11-464112-2015: Secondary Battery and Battery Pack Safety Certification Rules for Portable Electronic Devices   Background and Date of implementation 1. GB31241-2014 was published on December 5th, 2014; 2. GB31241-2014 was mandatorily implemented on August 1st, 2015. ; 3. On October 1...
  • Battery Crs Lead Time –  India – CRS – MCM

    Battery Crs Lead Time – India – CRS – MCM

    ▍Compulsory Registration Scheme (CRS) Ministry of Electronics & Information Technology released Electronics & Information Technology Goods-Requirement for Compulsory Registration Order I-Notified on 7th September, 2012, and it came into effect on 3rd October, 2013. Electronics &Information Technology Goods Requirement for Compulsory Registration, what is usually called BIS certification, is actually called CRS registration/certification. All electronic products in the compuls...
  • Lithium Battery Iecee Testing Time Service –  IECEE- CB – MCM

    Lithium Battery Iecee Testing Time Service – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Lithium Battery Battery Brazil Anatel Testing Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Battery Brazil Anatel Testing Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Battery Eac Test Lead Time –  Customs Union- EAC, GOST-R – MCM

    Battery Eac Test Lead Time – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Battery Taiwan Testing Price –  Taiwan- BSMI – MCM

    Battery Taiwan Testing Price – Taiwan- BSMI – MCM

    ▍BSMI Introduction Introduction of BSMI certification BSMI is short for Bureau of Standards, Metrology and Inspection, established in 1930 and called National Metrology Bureau at that time. It is the supreme inspection organization in Republic of China in charge of the work on national standards, metrology and product inspection etc. The inspection standards of electrical appliances in Taiwan are enacted by BSMI. Products are authorized to use BSMI marking on the conditions that they ar...
  • Lithium Battery Anatel Act.3484 Quotation Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Anatel Act.3484 Quotation Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Lithium Battery Iecee Testing Time Service –  IECEE- CB – MCM

    Lithium Battery Iecee Testing Time Service – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Lithium Battery Crs Testing Laboratory –  India – CRS – MCM

    Lithium Battery Crs Testing Laboratory – India – CRS – MCM

    ▍Compulsory Registration Scheme (CRS) Ministry of Electronics & Information Technology released Electronics & Information Technology Goods-Requirement for Compulsory Registration Order I-Notified on 7th September, 2012, and it came into effect on 3rd October, 2013. Electronics &Information Technology Goods Requirement for Compulsory Registration, what is usually called BIS certification, is actually called CRS registration/certification. All electronic products in the compuls...
  • Energy Storage Battery Un38.3 Report –  Transport- UN38.3 – MCM

    Energy Storage Battery Un38.3 Report – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • Japan Battery Pse Lead Time –  Japan- PSE – MCM

    Japan Battery Pse Lead Time – Japan- PSE – MCM

    ▍What is PSE Certification? PSE (Product Safety of Electrical Appliance & Material) is a mandatory certification system in Japan. It is also called ‘Compliance Inspection’ which it is a mandatory market access system for electrical appliance. PSE certification is composed of two parts: EMC and product safety and it is also an important regulation of Japan safety law for electrical appliance. ▍Certification Standard for lithium batteries Interpretation for METI Ordinance for Tech...
  • Battery Ctuvus Testing Laboratory Report –  America, Canada- cTUVus&ETL – MCM

    Battery Ctuvus Testing Laboratory Report – America, Canada- cTUVus&ETL – MCM

    ▍What is cTUVus & ETL CERTIFICATION? OSHA (Occupational Safety and Health Administration), affiliated to US DOL (Department of Labor), demands that all products to be used in workplace must be tested and certificated by NRTL before being sold in market. Applicable testing standards include American National Standards Institute (ANSI) standards; American Society for Testing Material (ASTM) standards, Underwriter Laboratory (UL) standards, and factory mutual-recognition organization st...