Featured

Browse by: All
  • Battery Reach Certificate Report –  Customs Union- EAC, GOST-R – MCM

    Battery Reach Certificate Report – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Lithium Battery Eac Test Items Report –  Customs Union- EAC, GOST-R – MCM

    Lithium Battery Eac Test Items Report – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Battery Iec 61960 Technical Documents Service –  Vietnam- MIC – MCM

    Battery Iec 61960 Technical Documents Service – Vietnam- MIC – MCM

    ▍Vietnam MIC Certification Circular 42/2016/TT-BTTTT stipulated that batteries installed in mobile phones, tablets and notebooks are not allowed to be exported to Vietnam unless  they are subjected to DoC certifctaion since Oct.1,2016. DoC will also be required to provide when applying Type Approval for end products (mobile phones, tablets and notebooks). MIC released new Circular 04/2018/TT-BTTTT in May,2018 which stipulates that no more IEC 62133:2012 report issued by overseas accredit...
  • Japan Certification Lead Time –  Japan- PSE – MCM

    Japan Certification Lead Time – Japan- PSE – MCM

    ▍What is PSE Certification? PSE (Product Safety of Electrical Appliance & Material) is a mandatory certification system in Japan. It is also called ‘Compliance Inspection’ which it is a mandatory market access system for electrical appliance. PSE certification is composed of two parts: EMC and product safety and it is also an important regulation of Japan safety law for electrical appliance. ▍Certification Standard for lithium batteries Interpretation for METI Ordinance for Tech...
  • Technical Documents Of Un38.3 Certification –  –  Transport- UN38.3 – MCM

    Technical Documents Of Un38.3 Certification – – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • Malaysia Sirim Technical Documents Service –  Malaysia- SIRIM – MCM

    Malaysia Sirim Technical Documents Service – Malaysia- SIRIM – MCM

    ▍SIRIM Certification For the security of person and property, Malaysia government establishes product certification scheme and puts surveillance on electronic appliances, information & multimedia and construction materials. Controlled products can be exported to Malaysia only after obtaining product certification certificate and labeling.  ▍SIRIM QAS SIRIM QAS, a wholly-owned subsidiary of the Malaysian Institute of Industry Standards, is the only designated certification unit o...
  • Lithium Battery Iecee Technical Requirement Lead Time –  IECEE- CB – MCM

    Lithium Battery Iecee Technical Requirement Lead Time – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Crs Lead Time Lead Time –  India – CRS – MCM

    Crs Lead Time Lead Time – India – CRS – MCM

    ▍Compulsory Registration Scheme (CRS) Ministry of Electronics & Information Technology released Electronics & Information Technology Goods-Requirement for Compulsory Registration Order I-Notified on 7th September, 2012, and it came into effect on 3rd October, 2013. Electronics &Information Technology Goods Requirement for Compulsory Registration, what is usually called BIS certification, is actually called CRS registration/certification. All electronic products in the compuls...
  • Lithium Battery Brazil Anatel Testing Laboratory Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Brazil Anatel Testing Laboratory Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Un38.3 Technical Requirement Service –  –  Transport- UN38.3 – MCM

    Un38.3 Technical Requirement Service – – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • Battery Crs Test Method Lead Time –  India – CRS – MCM

    Battery Crs Test Method Lead Time – India – CRS – MCM

    ▍Compulsory Registration Scheme (CRS) Ministry of Electronics & Information Technology released Electronics & Information Technology Goods-Requirement for Compulsory Registration Order I-Notified on 7th September, 2012, and it came into effect on 3rd October, 2013. Electronics &Information Technology Goods Requirement for Compulsory Registration, what is usually called BIS certification, is actually called CRS registration/certification. All electronic products in the compuls...
  • Fuel Cell Cb Service –  IECEE- CB – MCM

    Fuel Cell Cb Service – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...