Featured

Browse by: All
  • Battery Cb Certification Procedure Service –  IECEE- CB – MCM

    Battery Cb Certification Procedure Service – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Battery Tisi Test Report Thailand- TISI – MCM

    Battery Tisi Test Report Thailand- TISI – MCM

    ▍What is TISI Certification? TISI is short for Thai Industrial Standards Institute, affiliating to Thailand Industry Department. TISI is responsible for formulating the domestic standards as well as participating in international standards formulation and supervising the products and qualified assessment procedure to ensure the standard compliance and recognition. TISI is a governmental authorized regulatory organization for compulsory certification in Thailand. It is also responsible fo...
  • Battery Ctia Technical Documents Service –  Vietnam- MIC – MCM

    Battery Ctia Technical Documents Service – Vietnam- MIC – MCM

    ▍Vietnam MIC Certification Circular 42/2016/TT-BTTTT stipulated that batteries installed in mobile phones, tablets and notebooks are not allowed to be exported to Vietnam unless  they are subjected to DoC certifctaion since Oct.1,2016. DoC will also be required to provide when applying Type Approval for end products (mobile phones, tablets and notebooks). MIC released new Circular 04/2018/TT-BTTTT in May,2018 which stipulates that no more IEC 62133:2012 report issued by overseas accredit...
  • Lithium Battery Brazil Anatel Technical Requirement Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Brazil Anatel Technical Requirement Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Battery Iecee Testing Time Service –  IECEE- CB – MCM

    Battery Iecee Testing Time Service – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Battery Reach Lead Time Lead Time –  Customs Union- EAC, GOST-R – MCM

    Battery Reach Lead Time Lead Time – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Battery Etl Test Items Service –  America, Canada- cTUVus&ETL – MCM

    Battery Etl Test Items Service – America, Canada- cTUVus&ETL – MCM

    ▍What is cTUVus & ETL CERTIFICATION? OSHA (Occupational Safety and Health Administration), affiliated to US DOL (Department of Labor), demands that all products to be used in workplace must be tested and certificated by NRTL before being sold in market. Applicable testing standards include American National Standards Institute (ANSI) standards; American Society for Testing Material (ASTM) standards, Underwriter Laboratory (UL) standards, and factory mutual-recognition organization st...
  • Lithium Battery Iecee Requirement –  IECEE- CB – MCM

    Lithium Battery Iecee Requirement – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Lithium Battery Brazil Anatel Testing Price Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Brazil Anatel Testing Price Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Automotive Battery Un38.3 Certificate –  Transport- UN38.3 – MCM

    Automotive Battery Un38.3 Certificate – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • China Battery Cqc Lead Time Lead Time –  China- CQC – MCM

    China Battery Cqc Lead Time Lead Time – China- CQC – MCM

    ▍Certification Overview Standards and Certification Document Test standard: GB31241-2014: Lithium ion cells and batteries used in portable electronic equipment―Safety requirements Certification document: CQC11-464112-2015: Secondary Battery and Battery Pack Safety Certification Rules for Portable Electronic Devices   Background and Date of implementation 1. GB31241-2014 was published on December 5th, 2014; 2. GB31241-2014 was mandatorily implemented on August 1st, 2015. ; 3. On October 1...
  • Battery Eac Test Method Lead Time –  Customs Union- EAC, GOST-R – MCM

    Battery Eac Test Method Lead Time – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...