Featured

Browse by: All
  • Battery Fuel Cell Cb Lead Time –  IECEE- CB – MCM

    Battery Fuel Cell Cb Lead Time – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Taiwan Battery Bsmi Testing Lead Time –  Taiwan- BSMI – MCM

    Taiwan Battery Bsmi Testing Lead Time – Taiwan- BSMI – MCM

    ▍BSMI Introduction Introduction of BSMI certification BSMI is short for Bureau of Standards, Metrology and Inspection, established in 1930 and called National Metrology Bureau at that time. It is the supreme inspection organization in Republic of China in charge of the work on national standards, metrology and product inspection etc. The inspection standards of electrical appliances in Taiwan are enacted by BSMI. Products are authorized to use BSMI marking on the conditions that they ar...
  • Battery Pse Technical Requirement Report –  Japan- PSE – MCM

    Battery Pse Technical Requirement Report – Japan- PSE – MCM

    ▍What is PSE Certification? PSE (Product Safety of Electrical Appliance & Material) is a mandatory certification system in Japan. It is also called ‘Compliance Inspection’ which it is a mandatory market access system for electrical appliance. PSE certification is composed of two parts: EMC and product safety and it is also an important regulation of Japan safety law for electrical appliance. ▍Certification Standard for lithium batteries Interpretation for METI Ordinance for Tech...
  • America Ctuvus Tr Report –  America, Canada- cTUVus&ETL – MCM

    America Ctuvus Tr Report – America, Canada- cTUVus&ETL – MCM

    ▍What is cTUVus & ETL CERTIFICATION? OSHA (Occupational Safety and Health Administration), affiliated to US DOL (Department of Labor), demands that all products to be used in workplace must be tested and certificated by NRTL before being sold in market. Applicable testing standards include American National Standards Institute (ANSI) standards; American Society for Testing Material (ASTM) standards, Underwriter Laboratory (UL) standards, and factory mutual-recognition organization st...
  • Lithium Battery Ce Test Method Lead Time –  EU- CE – MCM

    Lithium Battery Ce Test Method Lead Time – EU- CE – MCM

    ▍What is CE Certification? The CE mark is a “passport” for products to enter the EU market and the EU Free Trade Association countries market. Any stipulated products (involved in the new method directive), whether manufactured outside the EU or in EU member states, in order to circulate freely in the EU market, they must be in compliance with the requirements of the directive and relevant harmonized standards before being placed on the EU market , and affix the CE mark. This...
  • Japan Battery Pse Testing Lead Time –  Japan- PSE – MCM

    Japan Battery Pse Testing Lead Time – Japan- PSE – MCM

    ▍What is PSE Certification? PSE (Product Safety of Electrical Appliance & Material) is a mandatory certification system in Japan. It is also called ‘Compliance Inspection’ which it is a mandatory market access system for electrical appliance. PSE certification is composed of two parts: EMC and product safety and it is also an important regulation of Japan safety law for electrical appliance. ▍Certification Standard for lithium batteries Interpretation for METI Ordinance for Tech...
  • Lithium Battery Un38.3 Certification –  Transport- UN38.3 – MCM

    Lithium Battery Un38.3 Certification – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • Battery Cqc Quotation Lead Time –  China- CQC – MCM

    Battery Cqc Quotation Lead Time – China- CQC – MCM

    ▍Certification Overview Standards and Certification Document Test standard: GB31241-2014: Lithium ion cells and batteries used in portable electronic equipment―Safety requirements Certification document: CQC11-464112-2015: Secondary Battery and Battery Pack Safety Certification Rules for Portable Electronic Devices   Background and Date of implementation 1. GB31241-2014 was published on December 5th, 2014; 2. GB31241-2014 was mandatorily implemented on August 1st, 2015. ; 3. On October 1...
  • Lithium Battery Cb Lead Time –  IECEE- CB – MCM

    Lithium Battery Cb Lead Time – IECEE- CB – MCM

    ▍What is CB Certification? IECEE CB is the first genuine international system for mutual recognition of electrical equipment safety test reports. NCB (National Certification Body) reaches a multilateral agreement, which enables manufacturers to obtain national certification from other member countries under CB scheme on the basis of transferring one of the NCB certificates. CB certificate is a formal CB scheme document issued by authorized NCB, which is to inform other NCB that the test...
  • Ni-Mh Battery Un38.3 Service –  Transport- UN38.3 – MCM

    Ni-Mh Battery Un38.3 Service – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • Ni-Cd Battery Un38.3 Service –  Transport- UN38.3 – MCM

    Ni-Cd Battery Un38.3 Service – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...
  • Lithium Battery Crs Testing Service Lead Time –  India – CRS – MCM

    Lithium Battery Crs Testing Service Lead Time – India – CRS – MCM

    ▍Compulsory Registration Scheme (CRS) Ministry of Electronics & Information Technology released Electronics & Information Technology Goods-Requirement for Compulsory Registration Order I-Notified on 7th September, 2012, and it came into effect on 3rd October, 2013. Electronics &Information Technology Goods Requirement for Compulsory Registration, what is usually called BIS certification, is actually called CRS registration/certification. All electronic products in the compuls...