Featured

Browse by: All
  • Tisi Certification Price Lead Time Thailand- TISI – MCM

    Tisi Certification Price Lead Time Thailand- TISI – MCM

    ▍What is TISI Certification? TISI is short for Thai Industrial Standards Institute, affiliating to Thailand Industry Department. TISI is responsible for formulating the domestic standards as well as participating in international standards formulation and supervising the products and qualified assessment procedure to ensure the standard compliance and recognition. TISI is a governmental authorized regulatory organization for compulsory certification in Thailand. It is also responsible fo...
  • Battery Eac Quotation Lead Time –  Customs Union- EAC, GOST-R – MCM

    Battery Eac Quotation Lead Time – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Lithium Battery Brazil Anatel Requirement Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Brazil Anatel Requirement Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Lithium Battery Gost R Test Report Report –  Customs Union- EAC, GOST-R – MCM

    Lithium Battery Gost R Test Report Report – Customs Union- EAC, GOST-R – MCM

    ▍What is GOST-R Declaration? GOST-R Declaration of Conformity is a declaration document to prove goods are complied with Russian safety regulations. When the Law of Product and Certification Service was issued by Russian Federation in 1995, compulsory product certification system came into force in Russia. It requires all products sold in Russian market to be printed with GOST mandatory certification mark. As one of methods of mandatory conformity certification, Gost-R Declaration of Con...
  • Tisi Lead Time Report Thailand- TISI – MCM

    Tisi Lead Time Report Thailand- TISI – MCM

    ▍What is TISI Certification? TISI is short for Thai Industrial Standards Institute, affiliating to Thailand Industry Department. TISI is responsible for formulating the domestic standards as well as participating in international standards formulation and supervising the products and qualified assessment procedure to ensure the standard compliance and recognition. TISI is a governmental authorized regulatory organization for compulsory certification in Thailand. It is also responsible fo...
  • Lithium Battery Anatel Act.3484 Testing Time Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Anatel Act.3484 Testing Time Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Battery Sirim Test Method Service –  Malaysia- SIRIM – MCM

    Battery Sirim Test Method Service – Malaysia- SIRIM – MCM

    ▍SIRIM Certification For the security of person and property, Malaysia government establishes product certification scheme and puts surveillance on electronic appliances, information & multimedia and construction materials. Controlled products can be exported to Malaysia only after obtaining product certification certificate and labeling.  ▍SIRIM QAS SIRIM QAS, a wholly-owned subsidiary of the Malaysian Institute of Industry Standards, is the only designated certification unit o...
  • Lithium Battery Brazil Anatel Lead Time Lead Time –  Brazil- ANATEL – MCM

    Lithium Battery Brazil Anatel Lead Time Lead Time – Brazil- ANATEL – MCM

    ▍What is ANATEL Homologation? ANATEL is a short for Agencia Nacional de Telecomunicacoes which is Brazil governmental authority to certified communication products for both compulsory and voluntary certification. Its approval and compliance procedures are the same both for Brazil domestic and abroad products. If products are applicable to compulsory certification, the testing result and report must be in line with the specified rules and regulations as requested by ANATEL. Product certif...
  • Battery Cqc Specification Lead Time –  China- CQC – MCM

    Battery Cqc Specification Lead Time – China- CQC – MCM

    ▍Certification Overview Standards and Certification Document Test standard: GB31241-2014: Lithium ion cells and batteries used in portable electronic equipment―Safety requirements Certification document: CQC11-464112-2015: Secondary Battery and Battery Pack Safety Certification Rules for Portable Electronic Devices   Background and Date of implementation 1. GB31241-2014 was published on December 5th, 2014; 2. GB31241-2014 was mandatorily implemented on August 1st, 2015. ; 3. On October 1...
  • Battery Crs Test Lead Time –  India – CRS – MCM

    Battery Crs Test Lead Time – India – CRS – MCM

    ▍Compulsory Registration Scheme (CRS) Ministry of Electronics & Information Technology released Electronics & Information Technology Goods-Requirement for Compulsory Registration Order I-Notified on 7th September, 2012, and it came into effect on 3rd October, 2013. Electronics &Information Technology Goods Requirement for Compulsory Registration, what is usually called BIS certification, is actually called CRS registration/certification. All electronic products in the compuls...
  • Lithium Battery Tisi Testing Time Lead Time Thailand- TISI – MCM

    Lithium Battery Tisi Testing Time Lead Time Thailand- TISI – MCM

    ▍What is TISI Certification? TISI is short for Thai Industrial Standards Institute, affiliating to Thailand Industry Department. TISI is responsible for formulating the domestic standards as well as participating in international standards formulation and supervising the products and qualified assessment procedure to ensure the standard compliance and recognition. TISI is a governmental authorized regulatory organization for compulsory certification in Thailand. It is also responsible fo...
  • Testing Time Of Un38.3 Service –  –  Transport- UN38.3 – MCM

    Testing Time Of Un38.3 Service – – Transport- UN38.3 – MCM

    ▍Document requirement 1.  UN38.3 test report     2.  1.2m drop test report (if applicable)    3.  Accreditation report of transportation              4.  MSDS(if applicable) ▍Testing Standard QCVN101:2016/BTTTT(refer to IEC 62133:2012) ▍Test item 1.Altitude simulation      2. Thermal test               3. Vibration     4. Shock                   5. External short circuit          6. Impact/Crush 7. Overcharge              8. Forced discharge             9. 1.2mdrop test repo...